ADI Construction completed the renovation of the elevator lobby on the 7th Floor for Front Point Security, after finishing the renovation of their full floor suite. This space included a re-haul of the vaulted dome sky light, as well as the installation of an intricate tile floor pattern to create movement and openness in the small area.