Badging Unit

About This Project

ADI Construction completed this build-out featuring bulletproof glass at the transaction windows and soundscape blades in the reception area. Metal mesh panels were installed in the mezzanine, along with LED pendant lights. Despite a permit delay and numerous design changes, ADI finished this project on schedule to meet the required timeframe.

Project Overview

  • Location: Arlington, VA
  • Completed: November 2016
  • Size (sqft): 4,280
TOP