901 N Stuart Spec Suites

About This Project

ADI completed the construction of five spec suites on the 4th floor, featuring a semiexposed structure, floating ceiling elements and LED lighting. This project also included renovations to the common corridors and elevator lobbies on the 3rd and 4th floor, while also completing the corridors and restrooms on five additional floors. The new restrooms feature stainless steel toilet partitions, “floating” frameless glass mirrors and specialty wall tile. LED lighting was used throughout the space, while the extensive use of glass at perimeters offices allowed for exterior light to impact all interior spaces.

Project Overview

  • Location: Arlington, VA
  • Completed: July 2017
  • Size (sqft): 31,111
TOP