ADI Construction completed the renovation of the elevator lobby on the 7th Floor for Front Point Security, after finishing the renovation of their full floor suite. This space included a re-haul of the vaulted dome sky light, as well as the installation of an intricate tile floor pattern to create movement and openness in the small area. LED lights were installed above a two panel television for waiting personnel, clients, and visitors that showcases their new space before entering the updated work area.